|
|
|
201-500 employees
View all
|
|
construction
|
|
London Bridge, London, GB
|
|
Tideway's Super Sewer is upgrading London's infrastructure to cope with demands well into the 22nd century and reconnecting the city with the iconic River Thames.
The Thames Tideway Tunnel is a 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river.
Starting in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works.
Overflows of untreated sewage into the River Thames add up to tens of millions of tonnes every year.
London's sewerage system relies on an integrated network of combined sewer overflows (CSOs). At the time it was built, the CSOs would release flows through discharge points along the river during heavy storms. Originally, this would happen once or twice a year, it now happens on a weekly basis and no longer requires a storm to trigger overflows.
By intercepting the sewage before it enters the river, the Thames Tideway Tunnel will help prevent the River Thames from being polluted with untreated sewage which can stay in the river for up to three months before the ebb and flow of the tide finally takes it out to sea.
For more information, visit our website www.tideway.london
Tideway Inclusive Recruitment statement:
We are one of The Times Top 50 Employers for Women, a Stonewall Diversity Champion, a proud signatory of the ‘Ban the Box’ campaign, and Disability Confident Committed Employer.
We pride ourselves on providing employment for disabled employees, providing support and adjustments during the recruitment process, and wherever needed in the working environment. We offer a guaranteed interview scheme for suitably qualified disabled applicants.
|
Tideway London Email Formats | Example Email Formats | Percentage |
---|---|---|
{first}.{last} | [email protected] |
100%
|
The widely used Tideway London email format is {first}.{last} (e.g. [email protected]) with 100% adoption across the company.
To contact Tideway London customer service number in your country click here to find.
Andy Mitchell is the CEO of Tideway London. To contact Andy Mitchell email at [email protected] or [email protected].
Find accurate personal emails, work emails and phone numbers for employees
Accelerate prospecting with instant access to 300M professionals from 30M companies with the right contact details.